Field/project development
The loan to Arena Energy will generate an estimated 38,600 B/D in new production from 22 platforms in the Gulf.
TotalEnergies signed off for 30% operated stakes in the Lang Lebah and B14 gas fields offshore Sarawak on the sidelines of ADIPEC in Abu Dhabi, while also highlighting methane-reduction partnerships in Angola, India, and Southeast Asia.
New rules requiring Mozambique’s LNG industry to supply 25% of production to the domestic market could stabilize gas deliveries to South Africa’s Secunda industrial center as the Pande and Temane gas fields near depletion.
-
This study compares, in a carbon capture and storage (CCS) context, the economics of a traditional business model vs. an alternative business model (a regional CCS hub separately managed by a special-purpose vehicle).
-
A surge in permit applications for long-term carbon storage sites reflects where industrially produced carbon dioxide can be harvested, and where the necessary pipelines are.
-
The contracts awarded by ExxonMobil and Equinor are for work offshore Guyana and Brazil.
-
The newbuild FPSO is destined for the giant Australian gas project in 2025.
-
A federal judge has upheld the Biden administration’s approval of the massive project on Alaska’s remote North Slope.
-
The four capital projects will enable Enterprise to send more NGLs to the Texas Gulf Coast.
-
Lac Da Vang is expected to deliver as much as 40,000 BOE/D at peak.
-
This paper presents a systematic review of the largest alkaline-surfactant-polymer flood project in the world, applied to the largest oil field in China.
-
The authors of this paper write that computationally coupled models enable swift, accurate, and engineered decision-making for optimal asset development.
-
AIQ, ADNOC, and SLB announced a new software suite that integrates artificial intelligence into reservoir analysis and field development projects.