Field/project development
Nitzana will enable Israel to double gas exports to Egypt from the giant Leviathan gas field in the Eastern Mediterranean.
Supermajor BP awards contract to same specialists who commissioned its Argos platform.
Train 4 is expected to add 6 million tonnes per year of capacity to the South Texas liquefied natural gas project when it goes online in 2030.
-
Total’s Laggan Tormore project claimed the International Petroleum Technology Conference (IPTC) Excellence in Project Integration Award at the 10th IPTC in Bangkok, Thailand.
-
In order to meet short- and medium-term expansion goals as well as ensure a sustainable long-term future, an operator has recently embarked on several greenfield and brownfield developments. These involve several megaprojects running in parallel with different teams.
-
In this first of a two-part series, the author describes why the use of lump sum contracts for FEED services contract followed by an EPC contract does not fulfil the requirements to lower oil and gas facilities capex.
-
Kashagan crude reached the global markets. The world’s most expensive upstream project restarted production and about 195,000 barrels, produced during the startup process, were shipped for export.
-
Applying an economic analysis for Trinidad and Tobago's deepwater gas fiscal regime, results were calculated for various price scenarios to identify a workable strategy for development of offshore resources.
-
Field-development projects need to include and consider not only a static or dynamic subsurface characterization but also the production-systems and facilities options, to trigger profitability and establish clear breakeven thresholds.
-
A key aspect of the project discussed in this paper is the use of minimal initial-production facilities to achieve significant early production from each of four preconstructed artificial islands.
-
This paper presents the development of Sapinhoá field, covering the fast-track transition and decision-making process, from appraisal to conceptual and basic engineering of the Sapinhoá pilot project and on to its subsequent execution, highlighting the challenges, lessons learned, and results.
-
A reason why projects are not completed on time is the disconnect between operators and contractors. An integrated asset approach tackles complex offshore jobs by being holistic and full field in nature and encompassing the planning, building, and operating phases of a project.
-
Iraq is producing oil at record levels this year but low oil prices have cast doubts on the economic feasibility of its licensing contracts, which some analysts and policy advisers say are holding back higher output.