Field/project development
This paper presents an approach for safe, efficient, and cost-effective legacy well reabandonment.
With confidence in subsea boosting performance growing, BP is incorporating pumping systems into both greenfield developments and brownfield expansions.
New agreements for exploration and production in Africa include activity in the Orange Basin offshore Namibia, offshore Angola, Senegal, and Côte d’Ivoire. In the Gulf of Mexico, a memorandum of understanding for deepwater evaluation was signed between Woodside Energy and PEMEX and Viridien initiated its Walker Ridge Reimaging Extension. TotalEnergies provided a targe…
-
The repeat order from Petrobras brings Keppel O&M’s net order book to about $8.2 billion.
-
First production from the UK North Sea gas field is expected in the second half of 2025.
-
Santos will seek an expedited appeal of the Australian Federal Court decision.
-
The Angolan project is expected to add 30,000 B/D of oil production by year-end 2024.
-
Vår Energi cited increased work scope, continued impact of global supply chain challenges for spike in the estimated cost of the Norwegian Continental Shelf project.
-
The decision to spend more than $700 million comes 4 years after the French giant shelved the project amid low oil and gas prices.
-
The Rosmari-Marjoram project will be developed utilizing subsea wells and solar power.
-
This paper describes a novel distributed quasi-Newton derivative-free optimization method for reservoir-performance-optimization problems.
-
The complete paper builds on existing tools in the literature to quantify the effect of changing well spacing on well productivity for a given completion design, using a new, simple, intuitive empirical equation.
-
This paper describes a development plan for an oil field discovered in a remote offshore environment in the Niger Delta that uses a probabilistic approach to estimate the STOOIP using low, mid, and high cases.