Field/project development
This paper presents an approach for safe, efficient, and cost-effective legacy well reabandonment.
With confidence in subsea boosting performance growing, BP is incorporating pumping systems into both greenfield developments and brownfield expansions.
New agreements for exploration and production in Africa include activity in the Orange Basin offshore Namibia, offshore Angola, Senegal, and Côte d’Ivoire. In the Gulf of Mexico, a memorandum of understanding for deepwater evaluation was signed between Woodside Energy and PEMEX and Viridien initiated its Walker Ridge Reimaging Extension. TotalEnergies provided a targe…
-
TechnipFMC will utilize its service base and umbilical factory in Angola for the EPCI contract.
-
SponsoredDeveloping a reservoir with current capex constraints requires innovative technology to provide reliable reservoir production insight. This article describes how chemical tracer technologies can be integrated into reservoir development plans to reduce risk, minimize capex, and maximize ROI.
-
Sandvik said it received the first large-scale stainless steel umbilical tube order for Mero. The tubes will be encapsulated by Prysmian Group.
-
On the edge of the Arabian Desert, a megaproject located above the Arctic Circle was given the IPTC Excellence in Project Integration Award.
-
After 4½ years out of service, the massive Wafra oil field is set to resume production soon, and ensuring a smooth restart is no small order.
-
Wood will provide the FEED and design for the offshore project. First oil is anticipated in 2024.
-
Suncor gets Canadian approval for Meadow Creek West.
-
Petrofac continues working relationship with UAE following contract awards for Dalma Gas Development project.
-
The Dalmatian project is a brownfield development and represents the world’s longest multiphase tieback by boosting at some 35 km; the boosting system is installed at approximately 6,000 ft water depth.
-
McDermott International has been awarded a large contract (defined by the company as between $50 and $250 million) by BHP to provide subsea umbilicals, risers, and flowlines (SURF), transportation and installation, and precommissioning of one jacket and topsides for the Ruby Project, offshore Trinidad and Tobago.