LNG
ExxonMobil and its Area 4 partners have awarded $1.1 billion in pre-investment contracts for long-lead upstream equipment supporting Mozambique's Rovuma LNG project. The awards, led by OneSubsea, mark a key step toward FID as development advances on ExxonMobil's largest global investment.
The sale of Woodside’s Calypso stake to BP completes the company’s withdrawal from Trinidad and Tobago after decades of operations in the country.
ExxonMobil’s Letter of Intent to begin preliminary engineering and procurement work for Mozambique’s Rovuma LNG project bridges the development to a final EPC contract, which Area 4 partners are expected to award following an FID anticipated by year-end 2026.
-
Douglas Westwoods' world FLNG market forecast for the period 2016-2022. A stormy ride is expected for the LNG industry, as the fall in natural gas prices limits investment in capital-intensive liquefaction projects.
-
Approximately 5% of world annual gas production is being flared or vented. This is equivalent to approximately 110–140 billion m3 (Bcm) of gas, and equates to the combined gas consumption of Central and South America in 2013.
-
This paper presents an overview of the challenges of using traditional synthesis gas reforming methods for efficient gas-to-liquids (GTL) conversion.
-
Achieving production and availability targets is paramount to the ultimate success of any liquefied-natural-gas (LNG) project. Both are important factors in any life-cycle economic analysis.
-
Despite the currently deteriorating oil and gas prices, natural gas, the “least carbon-intensive” fossil fuel, is still projected by ExxonMobil, the International Energy Agency, and other sources to grow by 65% from 2010 to 2040
-
The constraints of space and seaworthiness required the designers of Shell’s joint-venture floating-liquefied-natural-gas (FLNG) facility to assemble these technologies in novel configurations.
-
Conventional wisdom implies that natural-gas demand will continue to grow, especially in locations where coal is being phased out, nuclear growth has slowed/reversed, and renewables remain a small and intermittent energy source for the foreseeable future.
-
Floating LNG (FLNG) units have a higher risk of explosion than onshore plants because of the limited and congested environment on the ship. This paper focuses on proper design to address this hazard.
-
This paper provides a benchmarking of different cryogenic tanks in terms of operation life and type of containment (single- vs. double-containment tanks) in the LNG industry. The different options adopted to recertify these tanks are covered.
-
Carbon-molecular-sieve membranes (CMSMs) are a promising candidate for natural-gas purification because of their excellent stability, permeation selectivity, and permeability.