Asset Management
Lower operating expenditures and a changing asset mix helped UKCS operators cut average production costs by 9% year over year, despite relatively flat production levels, according to the NSTA.
The deal adds 40,000 B/D of production and epands Cenovus’ SAGD footprint with three Alberta assets.
The Federal Reserve Bank of Dallas’ third-quarter energy survey reflects industry views on the drawdown of the US Strategic Petroleum Reserve, the outlook for Persian Gulf crude exports, and expectations for oil prices.
-
The complete paper outlines adaptations of the SPE Petroleum Resources Management System to a company’s business processes.
-
The partners will explore Block 2K, an ultradeepwater block off Sabah.
-
The find is part of the Angola Block 15 redevelopment project expected to deliver around 40,000 B/D of additional production.
-
Opening additional channels of communication with our members provided important feedback to move forward with the Strategic Plan.
-
I would like to highlight the following works as promising technological developments for production and facilities: innovative measurement techniques, improvements to drilling safety, new developments in piping inspection, and a very interesting study of triangular vs. circular cross-sectional pipes.
-
The paper highlights the importance of adopting good practices when planning for decommissioning throughout the life cycle of a petroleum project.
-
An Equinor-led partnership to test prospect northeast of Visund.
-
Operators seek deepwater reserves on the Mexican side of the Gulf of Mexico.
-
This paper presents case studies of how produced-water salinity data was used to transform the performance of two oil-producing fields in Nigeria.
-
As the world continues to grapple with the post-pandemic new normal and unfamiliar global uncertainty, the case to begin and commit to a career in the upstream subsurface industry may be harder to see, but it’s still rewarding and with longevity.