Management
The operator has estimated about 500 million bbl of oil in place at Algaita in Block 15/06.
The planned facility was designed to process 34 MMcf/D of associated gas into fully refined gasoline.
The development is expected to add approximately 39 million BOE in recoverable resources to the Solveig field.
-
Challenges including increases in UK taxation have prompted operator Parkmead Group to drop plans to develop its Greater Perth project in the North Sea.
-
Follow-up sidetrack tested up to 5,000 B/D of oil.
-
Picking up the pace of innovation and demonstration of advanced nuclear reactors is required if nuclear is to play a role in decarbonization beyond electricity by providing low-carbon heat or hydrogen.
-
The record-setting probe has yielded a discovery estimated to be between 53–90 million BOE.
-
First gas is flowing from IOG’s Blythe H2 well, part of the Southern Banks gas development in the UK southern North Sea.
-
Successful well trio adds as much as 30 million BOE of recoverable reserves.
-
The drilling of the Berling field will begin in the third quarter of 2026, with gas and condensate production expected in 2028.
-
A new report said the US supermajor has made its second move in a month to enter the emerging lithium extraction industry.
-
The offering includes automatic evaluation of project economics and enhances collaboration to cut the time required for field development planning by up to 50%, according to the companies.
-
A new paper warns that meeting emission reduction targets in the top US oil basin will require a fourfold increase in available grid electricity.