Asset Management
Winners of Alberta's Drilling Technology Challenge cover a range of technologies from robotics to enhance drilling rig safety to AI-enabled energy management, downhole sensing, well navigation, hybrid power systems, and geothermal energy.
The transaction broadens the company's North Sea footprint with long-life assets that boost production and reserves.
Sponsored
Effective data analysis depends on seeing connections that matter. Explore how Spotfire enables a more intuitive approach to understanding petroleum data.
-
The new bottleneck for Texas’ crude production is not onshore—it is offshore. Shallow ports have kept big tankers from taking away the state’s expanding supply which has attracted a slew of proposed export projects.
-
Jobs with repetitive activities may decrease, while new types of onshore jobs are being created.
-
A Florida appeals court has approved exploratory oil drilling in the Everglades, prompting worries about Miami’s water supply and risks to the wetland ecosystem.
-
The second round will offer 19 offshore blocks clustered in five zones to continue natural gas development in the eastern Mediterranean’s Levant Basin.
-
Devon Energy will be getting simpler and smaller by selling two no-growth assets—gas acreage in the Barnett Shale in Texas and oil sand operations in Canada. Its future is staked on growing oil production in the Permian’s Delaware Basin and three other unconventional oil plays.
-
BP’s latest annual energy outlook considers many scenarios for the future, and they all require engineers to find a lot more oil to meet high demand.
-
The Oklahoma City independent has a new-look portfolio and new operational and financial priorities. And now it has enlisted an energy research firm to leverage advanced analytics and machine learning to help get the most out of its assets.
-
The announcement comes 7 months after the two received permission to begin the tendering process for the project offshore Nigeria, which is expected to carry a peak production of 225,000 BOPD by 2022.
-
Current production from the phase is 400 MMcf/D and expected to peak at 700 MMcf/D. A third phase also is slated to come on stream this year.
-
Trendsetter Engineering completed its 2-year design and build work for Noble Energy’s Leviathan project.