Asset Management
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO2 capture from many different gas mixtures with a large range of CO2 concentrations.
This work introduces a novel predictive methodology combini ang historical metocean data with real-time riser analysis for shallow water dynamically positioned (DP) rig operations, addressing a gap in industry literature. The integrated approach of predictive nonproductive-time (NPT) estimation, real-time monitoring validation, and structured decision protocols for cr…
This study explores the carbon-capture and mineralization potential of ultramafic rock powders when exposed to flue gases generated from combustion of crude oil and mesquite-derived charcoal.
-
The Federal Reserve Bank of Dallas’ fourth-quarter energy survey shows that oil prices and geopolitical uncertainty are curbing enthusiasm heading into the new year.
-
The transition follows a broader effort within BP to reorganize management and direct more capital to oil and gas projects.
-
The company engineered, designed, and manufactured multiple internal floating roof systems and tank-top equipment packages for TotalEnergies’ new storage terminal in Equatorial Guinea.
-
Fugro’s entry into the UK’s small modular reactor market follows its breakthrough in the US, where it secured a contract in February to perform a geoscience site investigation for the recommissioned Palisades Nuclear Power Plant in Michigan.
-
SponsoredAs HPHT wells push equipment to the edge of material limits, operators are turning to advanced thermoplastics and sealed electrical assemblies to maintain system integrity. From ESP insulation to BOP control systems, the right component design can prevent failures, lower intervention costs, and extend equipment life in the harshest offshore environments.
-
SPE member Silviu Livescu has been chosen to receive the award in recognition of his groundbreaking contributions to next-generation, low-enthalpy geothermal energy systems, which are enabling widespread, cost-effective building heating and cooling solutions.
-
The discovery in the Kutei Basin offshore Indonesia is being considered for fast-track development.
-
The new development is estimated to hold 46 million bbl of recoverable oil and is planned to start up in late 2028.
-
The project in the US Gulf is expected to add about 15,000 BOEPD to the deepwater Atlantis project at peak production.
-
Deepwater blocks drew most of the attention in the first lease sale for the offshore region to be held in 2 years.