Asset Management
The deal adds 40,000 B/D of production and epands Cenovus’ SAGD footprint with three Alberta assets.
The Federal Reserve Bank of Dallas’ third-quarter energy survey reflects industry views on the drawdown of the US Strategic Petroleum Reserve, the outlook for Persian Gulf crude exports, and expectations for oil prices.
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
-
Aker Solutions, SLB, and Subsea 7 have joined to create a subsea engineering firm to drive innovation and efficiency in subsea production.
-
The work scope for the project runs through year-end 2027.
-
The order builds on the expanded master equipment agreement between the companies for more than 100 mtpa of LNG.
-
Output from the field is expected to return to pre-shut down levels this summer.
-
Well is estimated to have encountered as much as 35 million BOE.
-
Two firms are using hydraulic fracturing to create high-pressure water reservoirs that can be turned on and off to meet electricity demand.
-
Program will focus on finding more resources around Goliat and Johan Castberg through 2026.
-
The current program comprises six planned wells.
-
Rig will continue to work offshore India.
-
Gas reserves will prove an important feedstock for Atlantic LNG facilities.