Asset Management
The deal adds 40,000 B/D of production and epands Cenovus’ SAGD footprint with three Alberta assets.
The Federal Reserve Bank of Dallas’ third-quarter energy survey reflects industry views on the drawdown of the US Strategic Petroleum Reserve, the outlook for Persian Gulf crude exports, and expectations for oil prices.
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
-
Lebanon hopes to join the club of EastMed gas producers as TotalEnergies and its partners spud an appraisal well near Beirut’s maritime border with Israel where gas is already being produced.
-
Fervo Energy’s bet that fracturing methods can be used for geothermal power is looking like a winner.
-
The authors’ work states that the qualification approach for offshore hydrogen pipeline systems should include material properties testing under various conditions.
-
The discovery in Putumayo could benefit from nearby existing infrastructure.
-
This paper is a summary of a study that covers through-life economics for producing green hydrogen from offshore fixed wind turbines.
-
The Anita Garibaldi was built by MODEC and will produce Marlim and Voador together with FPSO Anna Nery, already in operation.
-
Mukuyu-1 sidetrack proves a working hydrocarbon system in the Cabora Bassa basin.
-
The next phase of drilling is expected to resume in mid-2024 and includes several sidetrack wells, long-reach directional wells, and stratigraphic exploration wells.
-
The authors of this paper present the results of an assessment of two regions in Uruguay suitable for bottom-fixed offshore wind technologies.
-
Jackup rig Borr Norve has started drilling operations on the project’s fourth production well, DHIBM-6H.