Asset Management
The Loran Phase 2 license award builds on BP’s growing presence in Venezuela as it seeks to develop offshore projects, particularly shared fields near Venezuela’s maritime border with Trinidad and Tobago.
ExxonMobil and its Area 4 partners have awarded $1.1 billion in pre-investment contracts for long-lead upstream equipment supporting Mozambique's Rovuma LNG project. The awards, led by OneSubsea, mark a key step toward FID as development advances on ExxonMobil's largest global investment.
Gran Tierra will refocus its investment strategy to strengthen its portfolio in Canada and Azerbaijan while Maurel & Prom, majority owned by Pertamina’s international upstream arm, grows its South American footprint in Colombia and Ecuador.
-
The Dutch marine contractor says it plans to outfit its construction vessels with small modular reactors over 5 years.
-
The $2.9 billion Shah Deniz Compression project, expected online in 2029, will enable additional production of around 50 Bcm of gas and 25 million bbl of condensate.
-
Viper Energy is acquiring Sitio Royalties Corp. and its more than 25,000 net acres of royalty interests across major US shale plays.
-
Project expects a total of 19 additional modules to arrive on site during 2025.
-
Extensive acreage overlap and existing operational collaboration drove the acquisition decision.
-
This paper discusses the effect of injected-polymer viscosity on various aspects of a project, from recovery to surface facilities, including both theoretical arguments and practical field experience—which do not always align.
-
This work proposes a method to interpret far-field strain-change and pressure data to quantify fracture connectivity and properties at the cluster level.
-
This study leverages oil-fingerprinting technology and geochemical data to evaluate the fluid connectivity between a main field and its stepout wells.
-
Updates about global exploration and production activities and developments.
-
Once labeled “undrillable,” Brazil’s heavy-oil Atlanta field in the Santos Basin faced technical, financial, and logistical challenges. But through a phased approach, clever reuse of assets, and disciplined project execution, Brava Energia transformed a risky deepwater asset into a producing field with 172 million BOE in 2P reserves.