Asset Management
LibertyStream has signed a feedstock agreement with Goodnight Midstream to support its first commercial lithium carbonate facility in North Dakota's Bakken, advancing plans to extract battery-grade lithium from produced water.
The loan to Arena Energy will generate an estimated 38,600 B/D in new production from 22 platforms in the Gulf.
This article from Murphy Oil outlines a modernization effort that resulted in increased scenario simulation capacity by five to 10 times.
-
Oxy’s 1PointFive subsidiary and ADNOC plan to assess the feasibility of building the first megaton-scale DAC facility outside of the US.
-
Aker Solutions, SLB, and Subsea 7 have joined to create a subsea engineering firm to drive innovation and efficiency in subsea production.
-
The work scope for the project runs through year-end 2027.
-
The order builds on the expanded master equipment agreement between the companies for more than 100 mtpa of LNG.
-
This paper presents an approach to optimize the location of wellhead towers using an algorithm based on multiple parameters related to well cost.
-
This paper explores electrical submersible generator design considerations, theoretical underpinnings, and potential future applications.
-
This paper describes the application of learnings from an offshore project in the Caspian to an underground gas storage project to enhance drilling performance.
-
Output from the field is expected to return to pre-shut down levels this summer.
-
Program will focus on finding more resources around Goliat and Johan Castberg through 2026.
-
The current program comprises six planned wells.