Asset Management
Argentina’s President Javier Milei met with TotalEnergies CEO Patrick Pouyanné and Eni CEO Claudio Descalzi in Paris to discuss Argentina’s energy sector, including projects linked to the Vaca Muerta shale formation and the development of the Argentina LNG export project.
Known as Arena, the collaboration aims to improve decision-making across increasingly complex reservoirs and growing volumes of subsurface data.
Robotic and autonomous systems are transforming energy operations, but their full value emerges only when paired with data science, engineering analytics, and AI/ML to turn data into decisions. The transition of the SPE Robotic & Autonomous Systems Technical Section into the SPE Data Science & Engineering Analytics Technical Section helps bridge this critical technolo…
-
The Japanese company ratcheted up the competitive nature of contracting for a floating production, storage, and offloading vessel and an onshore liquefied natural gas plant for the Abadi project by announcing dual front-end engineering design (FEED) contracts.
-
Deepwater Yellowtail project, onstream 4 months ahead of schedule, is expected to produce an average of 250,000 BOPD.
-
The collection of undeveloped blocks includes 59 located in Nigeria's deep water.
-
Azule’s new FPSO is the first in the world to feature a pilot carbon capture and storage unit that sequesters CO₂ from onboard gas-turbine exhaust.
-
The deal follows Blackstone’s recent moves in gas-fired power and a pipeline venture with top US gas producer.
-
Shale’s slowdown leaves room for OPEC+ gains as tensions rise between the US and India over Russian oil imports.
-
This month’s column recaps the top five objectives for the 2025 SPE President and introduces a new discussion on the future of the SPE name.
-
The number of high-impact wells drilled across the globe this year are expected to be on trend with the most recent 5-year average.
-
BP called the Bumerangue discovery in the Santos Basin the company’s largest find in 25 years, and announced it had begun production from its tieback project at Argos ahead of schedule.
-
This paper reviews best practices and learnings from floating-production-unit transportation and installation, hookup, and commissioning and discusses subsea flowlines, export pipelines, and subsea-equipment installations.