Asset Management
Chevron, ExxonMobil, BP, and TotalEnergies are all back in Iraq as the country boosts its oil production target to10 million B/D within 6 years and seeks new pipeline export routes via Turkey and Syria to reduce reliance on the Strait of Hormuz.
LibertyStream has signed a feedstock agreement with Goodnight Midstream to support its first commercial lithium carbonate facility in North Dakota's Bakken, advancing plans to extract battery-grade lithium from produced water.
The loan to Arena Energy will generate an estimated 38,600 B/D in new production from 22 platforms in the Gulf.
-
The move to split oversight of Aramco from the Energy Ministry ends decades of tradition but is designed to avoid conflicts of interest ahead of what could be the largest IPO in history.
-
Recent exploration success in the North Sea has motivated Total to invest some $10 billion in the basin over the next 5 years.
-
With Norwegian authorities giving the go-ahead for startup, oil shipments from the massive Equinor-operated North Sea field could begin as soon as October, one month ahead of schedule.
-
After the oil price downturn, operators placed renewed emphasis on spending discipline, in drilling, project costs, and balance sheets. For some, that was a different metric: return to shareholders over production growth.
-
Technology is an enabler. But why do some technologies get deployed while other seemingly superior technologies struggle to get traction?
-
Colombia is walking a thin line between becoming another fading petroleum province and Latin America’s next big success story. Its aces in the hole: unleashing its nascent offshore and unconventional sectors.
-
The growing popularity of model-based optimization work flows has resulted in an increase in their application to field cases.
-
The complete paper discusses a study in which the authors propose a joint field-development and well-control-optimization work flow using high-performance parallel simulation and commercial cloud computing.
-
The complete paper describes a physics-based model of interference and a sensitivity study to propose guidelines for well spacing and a drilling timeline for multiple horizontal wells in the Vaca Muerta shale.
-
Occidental drillers and engineers figured out that it is faster and cheaper to reduce the weight on bit (WOB) than speeding ahead, which increased the risk of a breakdown and time lost for repairs.