Mature fields
Brazil’s ANP extends BW Energy’s contract for the deepwater field from 2031 to 2042, and BW plans to further develop the field.
Whether it’s reviving inactive gas-condensate wells or identifying overlooked reserves in brownfields, operators are making the most of older wells and fields.
The production unit for the Balder field in the North Sea is expected to go on-stream in the second quarter of 2025 following the staged tow-out of the FPSO.
-
As a field matures, there is a crucial need to focus on integrity-related issues such as hazard prevention and mitigation.
-
VICO Indonesia is the operator of the Sanga-Sanga production-sharing contract (PSC) in Indonesia.
-
In the southern North Sea, many fields suffer from declining gas production because of reservoir-pressure depletion and associated liquid loading.
-
A successful field trial in which foam was used as a gas-injection conformance enhancer was implemented in the Cusiana field in Colombia.
-
Regulations are driving increased decommissioning activities in the Gulf of Mexico. Incomplete data is one of the obstacles in planning decommissioning. As fields have changed ownership over time, key information has been lost, creating challenges for the current operator.
Page 13 of 13