Onshore/Offshore Facilities
Using case studies from Western Kazakhstan, this article shows how construction-led optimization cut installation costs by 60–70%, reduced construction scope by up to 80%, and lowered turnaround inspection labor by as much as 90%. The results improved schedule certainty, reduced risk, and increased efficiency across brownfield oil and gas facilities.
Production has begun at the company’s fifth FPSO-based development offshore Guyana just days after it sanctioned what will become its eighth project in the prolific Stabroek Block.
Of the eight ExxonMobil-led developments sanctioned to date in the Stabroek block, Longtail is the first to shift the focus from oil to gas and condensate production.
-
Software company FutureOn and consulting firm Wood are working together on an enhanced digital service for asset operators.
-
Design, construction specialist books new work in the Middle East, Australia, and Saudi Arabia.
-
The acquisition gives Enterprise’s natural gas and NGL business an entry point into the Midland Basin.
-
New projects coming on line throughout the year will vault the nation ahead of Australia and Qatar.
-
The authors present an artificial-intelligence and machine-learning technology to obtain a high-level, comprehensive view of all equipment in a facility to detect and map corrosion.
-
This paper describes a method to determine rig state from camera footage using machine-learning-based vision-analytics approaches.
-
The plan includes the development and operation of a first-of-its-kind high-voltage, direct-current (HVDC-VSC) subsea transmission system in the Middle East and North Africa region.
-
Natural gas delivered as LNG to growing economies in Asia has a strong role to play in achieving net zero in carbon emissions, and most of that gas will come from unconventional resources.
-
While the world focuses on carbon dioxide—its problems and its uses—many are looking at how to move it around. Fortunately, a pipeline infrastructure already exists. Unfortunately, the pipelines were made for natural gas and not enough is known about how that infrastructure can handle carbon dioxide.
-
QatarGas will take 1 mtpa over 15 years from new plant at Caofeidian.