Onshore/Offshore Facilities
ExxonMobil and its Area 4 partners have awarded $1.1 billion in pre-investment contracts for long-lead upstream equipment supporting Mozambique's Rovuma LNG project. The awards, led by OneSubsea, mark a key step toward FID as development advances on ExxonMobil's largest global investment.
SPE Offshore Europe 2027 has unveiled its conference theme, “(Em)Powering Europe: Securing Our Energy Future,” and opened the call for technical paper proposals for the Aberdeen event.
Flow measurement touches almost every phase of oil and gas operations. Yet the industry still struggles to distinguish between what is directly measured, what is inferred, and what is estimated through models, correlations, or assumptions. That distinction matters. A measurement does not need to be perfect to be useful, but it must be fit for purpose.
-
Offshore production assurance continues to drive new production technology applications and approaches. The three papers highlighted here focus on developing analytical tools and performing root-cause analyses while providing safe, cost-effective, and reliable operations.
-
In this paper, past gas-cycling operations were examined to identify subsurface implications and effects on operability aspects for the Arun giant gas field offshore Indonesia in the North Sumatra Basin.
-
This paper evaluates potential causes of failure for nine pipelines operating in shallow waters (8 to 14 m) in the Gulf of Guinea. The authors develop an analytical method to identify root causes and provide recommendations for pipeline design and placement.
-
Erosion caused by fine solid particles presents one of the greatest threats to oil and gas flow assurance, consequently affecting material selection and wall-thickness design.
-
Comprehension of the mechanisms that influence wax deposition in oil-production systems has not yet been achieved fully. This paper investigates the influence of the Reynolds number on wax deposition.
-
Japan’s SODECO and India’s ONGC Videsh are joining the consortium on the LNG plant, which will be carried out within the framework of the Sakhalin-1 hydrocarbon project in the Okhotsk Sea.
-
The green light comes 4 years after the privately-held firm filed its development and production plan. Liberty Island would consist of gravel, stretch 9 acres, and sit just a few miles offshore.
-
The unit is flowing oil and gas from the Lula Extremo Sul area, 290 km off Rio de Janeiro state in 2150 m of water.
-
Canadian agencies will begin establishing the scope of environmental assessment of the project, which is scheduled to start up in 2024.
-
Despite the uncertainty spawned by China’s recent decision to levy tariffs on US LNG imports, AGDC said it is still targeting a sale and purchase agreement with Chinese companies by the end of this year.