Onshore/Offshore Facilities
Using case studies from Western Kazakhstan, this article shows how construction-led optimization cut installation costs by 60–70%, reduced construction scope by up to 80%, and lowered turnaround inspection labor by as much as 90%. The results improved schedule certainty, reduced risk, and increased efficiency across brownfield oil and gas facilities.
Production has begun at the company’s fifth FPSO-based development offshore Guyana just days after it sanctioned what will become its eighth project in the prolific Stabroek Block.
Of the eight ExxonMobil-led developments sanctioned to date in the Stabroek block, Longtail is the first to shift the focus from oil to gas and condensate production.
-
This paper illustrates a case study from a greenfield oil development in Sarawak that is planned for a fit-for-purpose development scope to create value and develop oil resources in a phased manner within 4 years of project framing.
-
This paper aims to optimize well trajectories in offshore reservoir development by applying a Pareto-based multiobjective approach.
-
With a strong presence across US shale in the Bakken, Anadarko Basin, Powder River Basin, and the Permian, Continental Resources is expanding into Argentina’s Vaca Muerta shale as the privately held E&P giant pursues international growth.
-
ExxonMobil and its Area 4 partners have awarded $1.1 billion in pre-investment contracts for long-lead upstream equipment supporting Mozambique's Rovuma LNG project. The awards, led by OneSubsea, mark a key step toward FID as development advances on ExxonMobil's largest global investment.
-
SPE Offshore Europe 2027 has unveiled its conference theme, “(Em)Powering Europe: Securing Our Energy Future,” and opened the call for technical paper proposals for the Aberdeen event.
-
Flow measurement touches almost every phase of oil and gas operations. Yet the industry still struggles to distinguish between what is directly measured, what is inferred, and what is estimated through models, correlations, or assumptions. That distinction matters. A measurement does not need to be perfect to be useful, but it must be fit for purpose.
-
The sale of Woodside’s Calypso stake to BP completes the company’s withdrawal from Trinidad and Tobago after decades of operations in the country.
-
ExxonMobil’s Letter of Intent to begin preliminary engineering and procurement work for Mozambique’s Rovuma LNG project bridges the development to a final EPC contract, which Area 4 partners are expected to award following an FID anticipated by year-end 2026.
-
Williams' acquisition of Momentum Midstream creates a larger, more connected Gulf Coast gas network capable of meeting surging demand from LNG export facilities, power generators, and industrial users.
-
As 50-50 joint venture partners in Arrow Energy, the operator of the Surat Gas Project, Shell and PetroChina will share the AUD 713 million (USD 501 million) cost of Phase 3.