Onshore/Offshore Facilities
This paper identifies opportunities and risks associated with repurposing an offshore oil and gas platform for green hydrogen production. Various technical scenarios were investigated for the case study platform, and their profitability was determined using economic calculations. In addition, all the submodels were compared with standard decommissioning costs for reco…
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
-
Energy firm Vattenfall has conducted large-scale seabed surveys with uncrewed surface vessels. The company reports positive results, from both climate and safety aspects.
-
Proposed energy projects needing US federal permits will come under increased scrutiny related to the scope and magnitude of potential emissions.
-
Satellite imaging of methane emissions offers the fossil fuel industry the empirical data it needs to fix problems that companies might not even know they have before the EPA starts to levy fines in 2024.
-
The authors of this paper describe a software technology that balances calculated well-integrity risk with the associated financial impact for an entire integrity-surveillance program.
-
Industry leaders are harnessing the power of data to improve efficiencies, eliminate nonproductive time, and reduce Capex.
-
FSRU Exemplar will deliver natural gas to Finnish and Baltic markets via a decade-long contract with local transmission company.
-
After suffering a 2-year delay and unexpectedly large cost overruns, the Norwegian oil and gas field is expected to produce for 20 more years.
-
Instead of insights, traditional economic yardsticks in mature fields can create surprises. Buyers, investors, and lenders need new yardsticks—besides those based on present value—in order to make profitable decisions in mature properties.
-
The Marine XII area development could see 3 mtpa of LNG production by 2025.
-
NextDecade pushes the final investment decision on project to the first quarter of 2023.