Onshore/Offshore Facilities
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
This paper introduces in-pipe inspection technologies enabling high-resolution digital measurements of tubular internal diameter and wall thickness for critical downhole applications.
-
Global market conditions have impacted Magnolia LNG’s ability to reach FID. Kinder Morgan’s pipeline project also depends on an FID for the Magnolia LNG project.
-
To provide condition monitoring and combat fouling, the robot clings and moves along the hull walls. It is controlled via a 4G connection to clean and inspect the walls in line with individual vessel schedules developed through a proprietary algorithm and big data.
-
Two of Europe’s largest oil and gas producers will lead four offshore wind projects that together have the potential of powering 2 million homes.
-
Enterprise Products Partners publicly acknowledged the deep slump in pipeline demand out of the Permian Basin by canceling a project at a time when most producers have been quietly postponing US projects.
-
Rystad Energy compared the decommissioning costs based on two similar steel platforms, one in each region, using its cost-estimating tool.
-
Garden Banks Pipeline was notified that the Sea Robin delivery point was also made available after Enbridge lifted its force majeure.
-
Tellurian CEO Meg Gentle outlined how the US LNG market should address expected tight market conditions through 2025 while managing a transition to a carbon neutral environment.
-
The pipeline continues to operate as courts weigh expedited appeals from the Army Corp of Engineers and Energy Transfer.
-
The maritime technology company successfully completed a remote deadweight audit for a semisubmersible oil and gas drilling rig. Believed to be the first of its kind, the remote survey was developed in response to travel and social-distancing restrictions imposed during the COVID-19 pandemic.
-
The metocean and tidal conditions led to the development of the jetty-less solution for the project, which Delta Offshore continues to push toward FID.