Onshore/Offshore Facilities
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
This paper reviews a proof-of-concept project in which surplus casing pipes were used in the fabrication of purposefully designed artificial reef structures for the enhancement of biodiversity and commercial fisheries.
This paper presents a study that confirms glass-reinforced-epoxy-lined tubing as a reliable, cost-effective solution for long-term water-injection service in moderate-salinity offshore environments.
-
Discovered in 2010, the Búzios field offshore Brazil achieved a new milestone with the installation of its sixth production facility.
-
Key drivers of the rapid growth projection include Asia’s economic outlook and the rise of artificial intelligence.
-
The floating production, storage, and offloading vessel is the first in the world with a postcombustion carbon capture pilot system.
-
The engineering and construction firms take the first steps toward combining companies.
-
Texas GulfLink now turns to satisfying licensing conditions for the export terminal.
-
Fresh permit will allow the project to move forward towards FID this fall, first production expected in early 2029.
-
Closed-loop geothermal systems have entered the new-energy arena to generate electricity using the underground as a heat exchanger.
-
The new Sevan-designed cylindrical FPSO is expected to flow 45,000 BOE/D at peak.
-
A Shell partnership with YPF marks a significant milestone for the Argentina LNG export facility, raising new questions about the nation’s potential to unlock the economic power of its vast shale reserves.
-
Global offshore decommissioning projects hear the starting gun in Australia and the North Sea, but will the race be a marathon or a sprint?