Onshore/Offshore Facilities
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO2 capture from many different gas mixtures with a large range of CO2 concentrations.
This work introduces a novel predictive methodology combini ang historical metocean data with real-time riser analysis for shallow water dynamically positioned (DP) rig operations, addressing a gap in industry literature. The integrated approach of predictive nonproductive-time (NPT) estimation, real-time monitoring validation, and structured decision protocols for cr…
This paper documents the testing, integration, and field deployment of a metal expandable packer used as an openhole toe isolation plug in a deepwater well under high-pressure, high-temperature conditions.
-
The deal expands ONEOK’s gas transmission and processing footprint in the Permian, Louisiana, and Oklahoma.
-
The plan calls for developing a gas field, CCUS, and onshore compression, with first production expected in 2028.
-
This paper reviews decommissioning and abandonment in Nigeria, looks at candidate identification strategies, breaks down the methods and best practices involved, and examines the requirements for openhole and cased-hole abandonment.
-
Operator also announces plans to deploy continuous, real-time detection equipment at all its operated upstream sites, including GranMorgu, by the end of 2025.
-
Carnarvon basin job will be McDermott’s largest decommissioning project to date.
-
The pitfalls of utilizing an existing vessel without proper review are highlighted.
-
Contract awards for EPC on shore-based liquification facilities and FEED for upstream offshore infrastructure in Mozambique’s ExxonMobil–Eni project bodes well for an East African LNG hub.
-
The late-season hurricane caused damage across western Cuba and now is setting its sights on the US Gulf of Mexico.
-
Subject-matter experts from industry and academia advanced distributed fiber-optic sensing technologies and their implementation in flow measurement during a special session.
-
GE Vernova and Vineyard Wind provided an update on the implementation of their plan to safely remove the remainder of the damaged blade on turbine AW-38, remove any remaining debris, complete environmental studies, implement actions for blade readiness for service, and, ultimately, resume turbine installation and operations.