Onshore/Offshore Facilities
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
This paper documents the testing, integration, and field deployment of a metal expandable packer used as an openhole toe isolation plug in a deepwater well under high-pressure, high-temperature conditions.
-
First production from the UK North Sea gas field is expected in the second half of 2025.
-
Santos will seek an expedited appeal of the Australian Federal Court decision.
-
The Angolan project is expected to add 30,000 B/D of oil production by year-end 2024.
-
The new 42-in. ADCC pipeline will tie the Whistler Pipeline to Cheniere’s Corpus Christi liquefaction facility.
-
The floating terminal at Eemshaven will be capable of making 8 Bcm of gas per year.
-
The decision to spend more than $700 million comes 4 years after the French giant shelved the project amid low oil and gas prices.
-
Proposed revisions to 2019 Well Control Rule aim to bolster safe and environmentally responsible energy operations.
-
Peter Bernard, CEO of Datagration, discusses how oil and gas industry predictive maintenance doesn’t just provide an economic value, it also boosts safety by anticipating unpredicted failures among aging infrastructure.
-
Hiber has announced a new service for oil and gas operators looking to upgrade their field assets through digital surveillance. The company’s new HiberHilo wired-to-wireless converter turns analog well and pipeline data into wireless signals.
-
The Rosmari-Marjoram project will be developed utilizing subsea wells and solar power.