Onshore/Offshore Facilities
The long-term outlook analysis says a potential shift toward new construction could push 2026 production 3% above 2025 levels.
This paper identifies opportunities and risks associated with repurposing an offshore oil and gas platform for green hydrogen production. Various technical scenarios were investigated for the case study platform, and their profitability was determined using economic calculations. In addition, all the submodels were compared with standard decommissioning costs for reco…
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
-
The engineering company Cosmodyne will work directly with the utility company and its EPC contractor for the project, which will utilize its LINEX natural gas liquefier.
-
Operators are increasing capital budgets in the wake of tariffs and quotas initiated by the US government on steel imports, and the product exclusion process has revealed a host of other issues. If the tariffs are here to stay, what does industry hope to see moving forward?
-
Machine learning and artificial intelligence technology offer offshore operators the chance to automate high-cost, error-prone tasks to avoid the effects of inconsistency and errors in analysis, improving efficiencies and safety.
-
Tellurian remains on track to receive all regulatory approvals and begin work on the export terminal in Louisiana, with an eye on a 2023 startup.
-
Three companies are collaborating to develop the equipment needed to make LNG a feasible alternative fuel for ship owners and operators.
-
Troubleshooting and solving separation problems takes a combination of analytical tools, experience, and a knack for investigation. These 5 lessons provide a starting point for assessment.
-
With new projects scheduled to come on line later this year, the region, which mostly comprises states along the US Gulf Coast, will shift from being a source of natural gas supply to a source of growing demand.
-
The US Army of Corps of Engineers pulled the permit application after the company requested an extension on a review deadline for the project, which could accommodate up to 6 million tons of LNG production annually.
-
A method of data-driven risk analysis has been developed and applied to improve the efficiency and effectiveness of inspecting surface corrosion of SS316 piping on the Gjøa platform on the Norwegian Continental Shelf.
-
KBR will head a joint venture with TechnipFMC and JGC to provide a basic design package and EPC bid for the Bonny Island expansion.