Onshore/Offshore Facilities
The declaration builds on a memorandum of understanding the partners signed with Egypt in May to process Block 10 gas at the country’s LNG export and domestic gas facilities.
Alongside the new subsea awards, Equinor strengthened its position in the 400-million-bbl Bay du Nord development by acquiring BP’s interest in the project.
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
-
The complete paper presents a rigorous and consistent method to convert daily separator rates into stock-tank volumes. Recommendations for developing field-specific shrinkage correlations using field test data also are proposed.
-
The objective of the complete paper is to investigate and analyze energy-saving and process-optimization opportunities in upstream surface facilities, from downhole to the gas/oil separation plants (GOSPs), using a value-methodology approach.
-
Despite having strong wind resources and promising record-breaking capacity factors, most sites globally are unsuitable for bottom-fixed units. Floating wind will provide part of the solution for countries seeking to decarbonize their electricity.
-
Wind energy sources located offshore present challenges in transporting large amounts of energy. Energy transport through hydrogen molecules may be a solution. The PosHYdon project is intended to build experience with offshore H2 production and test power-to-gas technologies and integrated systems.
-
This paper’s intent is to provide a basic understanding of offshore renewable energy, including descriptions of wind and marine-hydrokinetic devices, with a focus on the physical and technical issues.
-
A system was designed to extend the offshore wind-energy concept from the power grid to a subsea field-development application. The system integrates a floating foundation with a wind-turbine generator, with all the required utilities hosted directly onboard the same floater.
-
Final lab testing has been completed and field trials of the ultrahigh expansion bridge plug will begin by the end of this year.
-
The Abu Dhabi National Oil Company announced that it has completed the first phase of its large-scale multiyear predictive maintenance project, which aims to maximize asset efficiency and integrity across its upstream and downstream operations.
-
ECA LNG will connect natural gas supply from Texas and the western US to Mexico and other countries across the Pacific Basin. First production from the project is expected in late 2024.
-
The expanded additive manufacturing services widen the companies’ targeted industries to include oil and gas, renewables, maritime, and aerospace.