Onshore/Offshore Facilities
The deepwater infill project is Esso Nigeria's first drilling campaign in a decade and is expected to boost Usan's production by up to 40,000 B/D.
After a record year for LNG project approvals in 2025, multiyear repairs to war-damaged liquefaction facilities in Qatar and the UAE threaten to slow the growth of global LNG capacity.
The declaration builds on a memorandum of understanding the partners signed with Egypt in May to process Block 10 gas at the country’s LNG export and domestic gas facilities.
-
Well plugging and abandoning on a limited budget is a lofty goal that forces the industry to consider new ways and new materials. Cost-effectively dealing with this global problem will require developing tools to carry out the decommissioning without bringing in a drilling rig.
-
Growing world demand for natural gas will drive increases in capital expenditures on LNG through 2019.
-
Subsea power demand is growing to support various processing loads, including pumps and compressors. This paper presents a modular direct-current electrical-power system that is designed for use in a subsea field with medium or long step-out distance
-
Rice University has been working on effective models of phase behavior and asphaltene deposition as a path to improved design that can reduce this challenge for operators.
-
The SPE Separations Technology Technical Section (STTS) hosted a special session titled “Unlocking Hidden Production Potential in Existing and Mature Fields” during the recent ATCE.
-
While decommissioning is not new, the need is accelerating, along with cost and regulatory requirements. A panel at ATCE discussed the challenges in executing decommissioning projects.
-
A strong reason for removing old platforms from the Gulf of Mexico, rather than trying to squeeze more years of marginal production out of them, is hurricanes.
-
Much of the new technology development occurring now is aimed at finding better ways to sever the thick, tough steel structures and wellheads so that they can be removed.
-
When he started his firm focused on removing obsolete offshore structures, Brian Twomey chose the name: Reverse Engineering Services. The thinking was that taking out a structure is like building it, but in reverse.
-
Riser slugging can restrict production and cause problems for downstream equipment. This paper discusses a simplified modeling approach to control of riser slugging.