Onshore/Offshore Facilities
ExxonMobil and its Area 4 partners have awarded $1.1 billion in pre-investment contracts for long-lead upstream equipment supporting Mozambique's Rovuma LNG project. The awards, led by OneSubsea, mark a key step toward FID as development advances on ExxonMobil's largest global investment.
SPE Offshore Europe 2027 has unveiled its conference theme, “(Em)Powering Europe: Securing Our Energy Future,” and opened the call for technical paper proposals for the Aberdeen event.
Flow measurement touches almost every phase of oil and gas operations. Yet the industry still struggles to distinguish between what is directly measured, what is inferred, and what is estimated through models, correlations, or assumptions. That distinction matters. A measurement does not need to be perfect to be useful, but it must be fit for purpose.
-
FLNG vessels will handle gas from the Vaca Muerta formation when they go online in 2027 and 2028 offshore Argentina.
-
Contractor will moor the production semisub in the Keathley Canyon area of the US Gulf of Mexico.
-
The Offshore Technology Conference has announced the 2025 Spotlight on New Technology Award winners—nine game-changing innovations shaping the future of offshore energy. Join the celebration at 1600 CDT on Monday, 5 May, at the NRG Center, Houston.
-
Updates about global exploration and production activities and developments.
-
SLB is introducing a new electric well-control system to replace larger conventional, fluid‑controlled hydraulic equipment.
-
This paper describes the operator’s digital-twin end-to-end production system deployed for model-based surveillance and optimization.
-
The authors of this paper describe a project to develop a virtual sensor to monitor the cooling effect downstream of a subsea choke to avoid hydrate plugs during cold-start operations.
-
First LNG at Tellurian’ asset known as Driftwood LNG before Woodside’s acquisition last year is expected in 2029.
-
The UK North Sea Transition Authority has awarded the required permits for the East Irish Sea project, and the project has reached financial close. The carbon capture and storage project is expected to receive its first carbon dioxide in 2028.
-
A US government order has stopped building activity aimed at harnessing wind energy offshore New York.