Onshore/Offshore Facilities
ExxonMobil and its Area 4 partners have awarded $1.1 billion in pre-investment contracts for long-lead upstream equipment supporting Mozambique's Rovuma LNG project. The awards, led by OneSubsea, mark a key step toward FID as development advances on ExxonMobil's largest global investment.
SPE Offshore Europe 2027 has unveiled its conference theme, “(Em)Powering Europe: Securing Our Energy Future,” and opened the call for technical paper proposals for the Aberdeen event.
Flow measurement touches almost every phase of oil and gas operations. Yet the industry still struggles to distinguish between what is directly measured, what is inferred, and what is estimated through models, correlations, or assumptions. That distinction matters. A measurement does not need to be perfect to be useful, but it must be fit for purpose.
-
Suncor Energy brought the Terra Nova FPSO back into production as part of an extensive field life extension project offshore Newfoundland and Labrador.
-
The job will increase the Heerema vessel’s second main hoist capacity by 1200 mt.
-
The Haewene Brim FPSO will need repairs to a pair of mooring connections before it can restart operations.
-
With the startup of South Ghawar field complete, the Saudi national oil company can look toward the commercialization of its tight-gas giant, Jafurah.
-
Several projects have been scrapped across the US as inflation causes project costs to soar, while projects in Costa Rica and Rotterdam move forward.
-
The newbuild FPSO is destined for the giant Australian gas project in 2025.
-
Glenfarne Energy Transition’s Texas LNG liquefaction plant will be built in the Port of Brownsville, Texas.
-
A federal judge has upheld the Biden administration’s approval of the massive project on Alaska’s remote North Slope.
-
The Biden administration’s goal of deploying 30 GW by 2030 was always ambitious; recent challenges make this more difficult to achieve. Addressing some of the industry headwinds is not only important for the 2030 goal, but it will also set the stage for the longer-term industry.
-
The Coastal Virginia Offshore Wind project is expected to power 900,000 homes, support thousands of jobs, and add 2,600 MW of energy to the grid.