Onshore/Offshore Facilities
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
This paper reviews a proof-of-concept project in which surplus casing pipes were used in the fabrication of purposefully designed artificial reef structures for the enhancement of biodiversity and commercial fisheries.
-
The data have been collected and analyzed from more than 18,000 equipment units with failure and maintenance records and includes information on subsea fields with more than 2,000 years of operating experience.
-
The subsea-technology company’s LUMA X subsea wireless communication modem will enable real-time streaming of HD-quality video and 4K images wirelessly through water, allowing the operators of autonomous underwater vehicles to monitor its interventions from its control rooms onshore.
-
Engie’s delayed supply contract with NextDecade’s Rio Grande LNG project is for 20 years. FID on the project is expected in 2021.
-
Future offshore oil and gas fields are likely to be satellite developments that emit less greenhouse gas because they do not require new production platforms. A new computational tool is now enabling the design of longer pipelines that will allow many more fields to be developed as satellites.
-
Cyberhawk will provide drone inspection, surveying, data visualization services, and inspection reports.
-
The Bureau of Safety and Environmental Enforcement approved the conversion of the Lena compliant tower platform into an artificial reef under the bureau’s Rigs to Reefs program.
-
The newly launched video series featuring speaker Bob Chin, the creator and editor of the OGF Savvy Separator Series of articles, provides a basic level of understanding of separator design and troubleshooting.
-
The LNG project includes development of offshore gas fields in Mozambique’s Area 1 and a liquefaction plant with a capacity in excess of 12 mtpa. The gas turbines are slated for delivery in 2H 2021 and 1H 2022, and the compressors are expected in 2021.
-
Akers BP said it will use lessons learned from the pilot and scale the remote-assist concept across its assets.
-
Breakwater’s produced-water-recycling facility has the flexibility to recycle, store, or dispose of water. It has already recycled nearly 5 million bbl of produced water in the third quarter of 2020.