Onshore/Offshore Facilities
The events will be co-located 3–5 May 2027 at Reliant Park in Houston, Texas.
The supermajor said the fields are not expected to contribute meaningfully to its production profile by 2030.
This paper reviews a proof-of-concept project in which surplus casing pipes were used in the fabrication of purposefully designed artificial reef structures for the enhancement of biodiversity and commercial fisheries.
-
An EIA report shows natural gas exports reaching 4.6 Bcf/D in February, the 13th consecutive month in which the country's natural gas exports exceeded its imports. Exports are projected to reach 7.5 Bcf/D by 2020.
-
Virtual metering technology has been in use for years as a cost-effective means of monitoring production, but what else can it do? How reliable is it as a backup to physical multiphase meters?
-
Could 2019 be a bumper year for offshore energy development?
-
This paper demonstrates a new way to create gas-tight seals during well abandonment, overcoming the limitations of traditional methods and reducing the operator’s liability and potential environmental impact after decommissioning has been completed.
-
Deepwater capital expenditure has nosedived since the oil-price crash of 2014 and has not quite recovered because of the high level of break-even prices required, but some oil companies maintained their interest in the sector and went ahead with big-ticket projects anyway.
-
Natural gas, often hailed as the bridge to an energy future that will include greater demand for alternative energy supplies, may be poised to overtake oil as the globe’s primary fuel source in the next decade.
-
Ashtead Technology has acquired Louisiana-based subsea equipment rental and cutting services specialist, Aqua-Tech Solutions, as part of the company’s international growth plans in the US.
-
High-fidelity 3D engineering simulations are valuable in making decisions, but they can be cost-prohibitive and require significant amounts of time to execute. The integration of deep-learning neural networks with computational fluid dynamics may help accelerate the simulation process.
-
ExxonMobil signed a sales and purchase agreement with Zhejiang Provincial Energy Group for LNG supply. Zhejiang Energy is expected to receive 1 mtpa over 20 years.
-
Decommissioning and abandonment comes with its share of unexpected surprises, but many of those surprises could be avoided merely through better planning and care.