Onshore/Offshore Facilities
Train 4 is expected to add 6 million tonnes per year of capacity to the South Texas liquefied natural gas project when it goes online in 2030.
Louisiana-based project will use operator’s Optimized Cascade process to turn feed gas into LNG.
Updates about global exploration and production activities and developments.
-
The sole bidder for the Bahia liquefied natural gas regasification terminal in Brazil was turned away for noncompliance of tender rules.
-
The midstream operators plan to have the CO2 pipeline network operational as soon as 2025 and flowing at full stream by 2027.
-
The marine contractor will utilize its North Ocean 102 pipelay/lift vessel for the work at the Shenzi field.
-
Tropical storms severely affect oil and gas production in the Gulf of Mexico, especially during the storm season from June to December. Offshore well managers often need to shut down operations and evacuate the facility because of storm alerts. The purpose of this paper is to determine the effect of storms on production by quantifying metrics such as downtime days and…
-
Experts from around the world highlight that, while natural gas has an important role to play in the energy transition, it is one that changes from region to region.
-
Norway appears to be taking a dual approach to energy transition. In its just-released energy white paper, the Norwegian government says it is committed to producing renewable energy and bolstering its power grid but isn’t willing to halt development of its oil and gas resources.
-
This 17th article in the Savvy Separator Series addresses how process flow conditions can lead to incorrect or misinterpreted level readings. Poor process vessel design is often exacerbated by miscalibrated instrumentation, leading to suboptimal operation and poor efficiency of the separator. In some cases, the location of the instrumentation can also lead to erroneou…
-
IGU report highlighted pandemic-related delays that kept many international projects from coming on line in 2020.
-
The company's CEO said future plans for the 1,200-mile-long pipeline have been officially terminated.
-
President Biden is seeking plans from pipeline operators aimed at curbing methane emissions in their daily operations.