Onshore/Offshore Facilities
This paper presents a flexible, highly cost- and energy-efficient method of gas separation and CO₂ capture from many different gas mixtures with a large range of CO₂ concentrations.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
This paper documents the testing, integration, and field deployment of a metal expandable packer used as an openhole toe isolation plug in a deepwater well under high-pressure, high-temperature conditions.
-
Billed as the world’s longest AC power-from-shore project, Aker BP’s NOA Fulla field and Equinor’s Krafla field in the North Sea will be powered from the mainland by renewable hydropower.
-
Bechtel gets the go-ahead to begin early engineering and procurement work under a limited notice to proceed.
-
Baker Hughes will supply a plug-and play modularized liquefaction train system for the Plaquemines LNG project.
-
The proposed LNG terminal will expand Germany's alternatives for gas supply and reduce its dependence on Russian imports.
-
UK offshore oil and gas producers are moving closer to the region's goal of achieving zero routine flaring by 2030.
-
The largest US oil and gas company is ending its 25-year presence in Russia following its invasion of Ukraine and subsequent international sanctions.
-
A week after its certification was halted, the company managing the Gazprom-operated pipeline has let go its staff and says its website has been attacked.
-
The paper presents the challenges faced and overcome while drilling and testing a high-pressure/high-temperature sour-gas well offshore in an environmentally sensitive environment.
-
The Canadian Government has stopped funding the Trans Mountain Pipeline, whose future will depend on private investors.
-
Deal between P’nyang partners and independent state a step forward for the proposed development of the P’nyang LNG project.