Onshore/Offshore Facilities
The 2026 Upstream Scale Guidelines establish a common workflow for field measurements, scale modeling, and risk assessment to support more consistent operational decisions.
Shell has reached FID on LNG Canada Phase 2, a major expansion that will double the Kitimat facility’s LNG export capacity to 28 mtpa and strengthen long-term supply to growing Asian markets.
The long-term outlook analysis says a potential shift toward new construction could push 2026 production 3% above 2025 levels.
-
Learn how different inlet designs affect fluid dynamics and ultimately scrubber performance.
-
An ecosystem-based management program is described to assess the potential sensitivities and contribution of the platform as an artificial reef.
-
After initial exploration, a prospect deep in the Amazon jungle was declared non-commercial. The authors discuss how the initial project planning contributed to the decommissioning effort by means of life-cycle planning.
-
Projects are being delayed or deferred due to low oil prices, which is affecting the market for subsea, umbilicals, risers, and flowlines (SURF).
-
Efficient separation assumes uniform flow, but the reality of inlet geometries can invalidate this assumption, leading to separation problems and loss of separation efficiency.
-
More precise measurement can create a dilemma. One example is the precise fluid flow measurements used to control managed pressure drilling (MPD) systems.
-
In this paper, an analysis of the selection of integrated template structures (ITSs) for Arctic environments is presented.
-
This paper describes the architecture of the Lucius Gulf of Mexico subsea production system and the drivers behind it.
-
This paper addresses the standardized features applied to the 10,000-psi-rated subsea-system components at the Espirito Santos FPSO in the Campos basin offshore Brazil.
-
The need for standardization of subsea equipment has never been greater. With the drop in oil prices, cost reduction has become critical.