Pipelines/flowlines/risers
This paper presents a study that confirms glass-reinforced-epoxy-lined tubing as a reliable, cost-effective solution for long-term water-injection service in moderate-salinity offshore environments.
A circular economy emphasizes reducing, reusing, recycling, and removing parts of existing systems to optimize them with respect to resource utilization. The following papers demonstrate how these pillars of a circular economy are enabling operators all over the world.
This paper introduces in-pipe inspection technologies enabling high-resolution digital measurements of tubular internal diameter and wall thickness for critical downhole applications.
-
Work is to be executed offshore Congo, the US Gulf of Mexico, Romania, and Germany.
-
Company to revamp the platforms and facilities of the Bouri gas field offshore Libya.
-
The venture will deploy Eni's real-time, pipeline-integrity monitoring system.
-
McDermott’s latest EPCI contract on Qatar’s North Field expansion focuses on subsea cabling and offshore/onshore pipelines to be fabricated locally.
-
Dos Caminos joint venture additions will be capable of delivering 2.0 Bcf/D of natural gas.
-
By initially ring-fencing Absheron’s gas for the domestic market, Azerbaijan will be able to export more of its overall gas production to Europe from across other projects.
-
Corrosion is a pervasive issue that affects oil and gas production. It poses a significant threat to the safety and integrity of oil and gas equipment, and it can lead to costly repairs and downtime. Mitigating corrosion is a crucial part of maintaining the productivity and safety of oil and gas operations.
-
This paper presents an intelligent tube solution that combines data retrieved by the sensors with the actual resistance of each pipe in the well to allow adjustment of production parameters while ensuring installation safety.
-
Production from the Dover field is expected to start in late 2024 or early 2025.
-
The second phase of the project will analyze data gathered in Phase 1, with the goal of improving riser, wellhead, and conductor fatigue estimates.