Pipelines/flowlines/risers
New rules requiring Mozambique’s LNG industry to supply 25% of production to the domestic market could stabilize gas deliveries to South Africa’s Secunda industrial center as the Pande and Temane gas fields near depletion.
The Absheron gas field expansion will supply additional natural gas to Azerbaijan’s domestic market and support its export commitments to Turkey, allowing Baku to stay focused on meeting its gas export obligations to Europe.
This work introduces a novel predictive methodology combining historical metocean data with real-time riser analysis for shallow water dynamically positioned rig operations.
-
This paper presents the results of a performance-improvement effort in extended-reach drilling (ERD) in three campaigns in the Huizhou HZ 25-4 oil field in the South China Sea.
-
The Papa-Terra field in the Campos basin in Brazil is identified as having an oil interval of 14.6°API in turbidite sandstones.
-
This paper presents results from full-scale testing of a flexible riser equipped with embedded sensors for distributed-temperature sensing (DTS).
-
Water condensation and/or hydrate formation at the top of pipelines are serious design/operation considerations in pipelines. This paper reports the results of tests conducted in a new experimental setup constructed for investigating gas-hydrate risks in varied operational scenarios.
-
Vibration-induced fatigue failures of pipework smallbore connections result in elevated safety risks and costly interruptions to normal operations. A common cause is poor design. This article discusses design considerations to avoid these failures.
-
A relatively small concentration of a defoamer can have a significant impact on the dynamics of multiphase flow within a pipe, but the effect is generally temporary.
-
There are few deepwater-pipeline operators with expertise in pipeline repairs. This paper describes a strategy developed and implemented on deepwater-pipeline intervention, based on a deepwater operational experience built over a decade.
-
This paper illustrates a numerical approach to estimate the deposition profile of precipitated wax crystals and its effect on flow-related parameters in pipelines. Options for avoiding these issues are also explored.
-
As with many monitoring and decision support tools, riser management systems originate from the engineering community so may assume a large degree of domain knowledge.
-
A program was devised to test the manufacturability of shrink-fit joints made from high-strength (greater than 100 ksi) mill pipe and forged couplings.