Production
Production has begun at the company’s fifth FPSO-based development offshore Guyana just days after it sanctioned what will become its eighth project in the prolific Stabroek Block.
Chevron, ExxonMobil, BP, and TotalEnergies are all back in Iraq as the country boosts its oil production target to10 million B/D within 6 years and seeks new pipeline export routes via Turkey and Syria to reduce reliance on the Strait of Hormuz.
The loan to Arena Energy will generate an estimated 38,600 B/D in new production from 22 platforms in the Gulf.
-
The FPSO Anna Nery is the first of two floaters set to revitalize production at the Marlim field in the northeastern part of the Campos Basin offshore Brazil.
-
Paraffin deposition on the meters measuring produced water volumes causes inaccurate readings. New technology solutions enable lasting accuracy in the place of routine maintenance that provides a temporary solution.
-
The two LM9000-driven trains are part of the ZLNG nearshore floating LNG project.
-
The semisubmersible host is the centerpiece of BP’s $9-billion Mad Dog Phase 2 project.
-
In Part 1 of a series of articles, the author highlights candidate selection and problem clarification. This section describes how the success rate of solving conformance problems is improved by reducing assumptions and improving your problem understanding prior to executing a solution.
-
This paper presents autonomous-inflow-control-device installations in multiple horizontal wells of the Singue oilfield development in Ecuador.
-
This year’s history matching and forecasting selections cover topics that include performance prediction of a polymerflood pilot in a heavy oil reservoir, multivariate characterization and modeling of a paleo zone, and multiwell pressure history matching in an unconventional reservoir.
-
Our shifting energy landscape requires a new way to measure the amount of energy that can be extracted from any given source against the energy required to produce and distribute it.
-
Production from the Dover field is expected to start in late 2024 or early 2025.
-
A new report from Rystad Energy expects more than $200 billion will flow into greenfield offshore projects over the next 2 years.