Production
Trafigura will purchase 100,000 metric tons of battery-grade lithium products under a decade-long take-or-pay contract valued at over $2 billion.
The 2026 Upstream Scale Guidelines establish a common workflow for field measurements, scale modeling, and risk assessment to support more consistent operational decisions.
The long-term outlook analysis says a potential shift toward new construction could push 2026 production 3% above 2025 levels.
-
The authors describe a carbonate reservoir stimulation technique able to deploy acids in the rock far away from the wellbore through mechanically drilled holes with known depths and azimuths.
-
The complete paper reviews the history of enhanced oil recovery and the Scurry Area Canyon Reef Operators Committee, discusses changes in theory over time, and provides a look at the field’s future.
-
Karoon Energy will put the rig to work in its Baúna field.
-
The Green Canyon Block 21 well has underperformed flow expectations since commencing production.
-
Oil from the Santos Basin has been postponed due to delays with the production system.
-
The contractor will supply subsea equipment for the Brazilian state oil company’s Marlim, Voador field revitalization project.
-
The way gas injection is used to lift oil and water to the surface needs to change because better control and data may mean more production. At a time when engineers are managing so many wells, they need help from machines.
-
Getting more out of gas lift requires understanding how gas injections interact with the oil, water, and gas flowing up the well—in other words, multiphase flow. Some papers are listed to get you started.
-
Country’s president expects 10 additional wells in its waters this year.
-
Forecast sees 12% boost in the region’s crude production by the end of 2022.