Production
After launching pre-salt production in Brazil, the ultradeepwater Tupi asset has become one of Petrobras’s most productive.
North Sea operators produced an additional 16 million BOE from 56 reinstated wells in 2025 as improved intervention efficiency lowered costs and helped restore shut-in assets to production, according to the NSTA.
This contributed article highlights the growing importance of fiber-optic sensing and its potential to advance thanks to emerging quantum technologies.
-
First oil from the 120,000-B/D Liza Destiny floating production, storage, and offloading vessel, which arrived on the block in late August, is targeted for December.
-
The Esox-1 well encountered 58 m of high-quality oil-bearing Miocene reservoirs and will be tied back to Tubular Bells production facilities.
-
The Sidri 36 appraisal well confirmed the downdip westward extension of the Sidri 23 discovery announced last July by the Italian major.
-
The time it takes for a shale producer to drill a well has been a major focus for the past decade. A new report says the industry should place equal weight on how long it takes a well to actually deliver first oil.
-
New projects coming on stream will boost US gulf oil output to 1.9 million B/D in 2019 and 2 million B/D in 2020, EIA projects.
-
Nanotechnology has great potential to reduce cost, increase production, and even improve the sustainability of E&P operations. But, where do we stand in terms of potential vs. reality? And, is the industry ready and willing to use the technology?
-
This paper details the design and execution of what the authors say they believe is the first successful frac-pack operation in a previously gravel-packed well.
-
Remote and integrated operations can make production safer and more efficient. Despite this, the industry has struggled to implement these clearly effective techniques.
-
Just like Houston’s summer heat, corrosion of metal surfaces will occur—whether you like it or not. To help you better understand corrosion, these papers describe using water surveys in a production/injection plant, testing the effectiveness of mitigation, and data evaluation using machine learning.
-
Rystad estimates almost 2 million B/D will remain shut in on average during September and October, with full restoration to pre-attack levels not coming until closer to year end.