Reservoir
Latest 5-year assessment puts undiscovered technically recoverable gas resources on the US Outer Continental Shelf at 218 Tcf.
Sponsored
Unwanted water production can erode well performance and asset economics if left unmanaged. Interwell’s precision water shutoff approach, grounded in diagnostics and engineered isolation, helps operators identify water-entry points, protect hydrocarbon flow, and restore sustainable well performance in mature and complex wells.
More than 150 researchers will work on the Libra Rocks project, which aims to unlock insights that could improve recovery and reservoir management in one of Brazil’s largest offshore oil fields.
-
Many different completion techniques, such as vertical-well multiseam completions and multiple lateral wellbores drilled into a single coal seam, have been used to develop coalbed methane (CBM) reservoirs.
-
This paper presents a pragmatic approach to frame, evaluate, and compare appraisal strategies in resource plays.
-
The M4-field reservoir is approximately 2000 m below sea level in a water depth of approximately 120 m. A carbon dioxide (CO2) geological-storage study was carried out to determine the feasibility of injecting and storing CO2 in the depleted M4 carbonate gas reservoir.
-
Exploration wells, unconventional plays, and development wells can benefit from NeoScope, a sourceless formation evaluation-while-drilling solution. Two case studies share how the technology mitigates the risks or logistic complications associated with chemical nuclear sources.
-
As oil companies have moved to more-marginal reservoir targets, application of conventional techniques has often yielded disappointing results, and tighter zones are often abandoned for more-promising target intervals.
-
A successful field trial in which foam was used as a gas-injection conformance enhancer was implemented in the Cusiana field in Colombia.
-
A number of hurdles need to be overcome to reach a successful action/reaction, problem-free status in EOR operations.
-
The Diatomite reservoir in the Belridge field, California, has been under pressure-maintenance water injection to mitigate reservoir compaction and improve oil recovery.
-
To increase the oil recovery in the Albacora field, significant water injection is required that was not considered in the initial project-development phases.
-
The rapid growth in the development of unconventional shale resources has changed business-as-usual for onshore production equipment manufacturers and suppliers.