Offshore/subsea systems
The company has installed an autonomous drone system on Aker BP’s Edvard Grieg platform in the North Sea, enabling frequent, remote inspections from shore.
This paper describes the use of coiled tubing in a pilot project for carbon dioxide injection, enabling evaluation of the conversion of an existing oil field for CCS purposes and derisking storage-development uncertainties before having to cease hydrocarbon production.
This paper describes the first riserless coiled tubing services operation performed in a live subsea well and the associated improvements in efficiency, cost savings, and safety.
-
In this paper, a dynamic multiphase-flow simulator is used to evaluate the effectiveness and suitability of using a subsea capping stack to respond to a CO₂ well blowout.
-
This paper presents an overview of the operator’s Marlim and Voador fields revitalization project, highlighting features and main achievements in the context of Campos Basin redevelopment.
-
The planned use of an uncrewed surface vessel to inspect shallow-water infrastructure for Petrobras follows a previous remote operation survey for the operator.
-
First oil from Beacon Offshore’s Shenandoah is on track for the second quarter of 2025. Project partners also have sanctioned a second phase of development and are advancing plans for a related project.
-
Deepwater subsea tieback expected online by the end of the decade, targeting more than 300 million BOE.
-
Supermajor reached a final investment decision on a two-well subsea development to be hosted by the Perdido spar platform in the deepwater Gulf of Mexico.
-
The grant was awarded by the Scottish Funding Council in partnership with Scottish Enterprise to assist in developing an AI demonstrator to optimize subsea decommissioning.
-
Underwater robots that can predict waves in real time could reduce the cost of producing offshore renewable energy, a study suggests.
-
If the find is commercially viable, the company and its partners say a subsea-to-shore development plan could produce first gas as early as 2027.
-
More than 40 years since its discovery, a hot and stubborn gas reservoir offshore Abu Dhabi has been tamed.