Floating production systems
Production has begun at the company’s fifth FPSO-based development offshore Guyana just days after it sanctioned what will become its eighth project in the prolific Stabroek Block.
Of the eight ExxonMobil-led developments sanctioned to date in the Stabroek block, Longtail is the first to shift the focus from oil to gas and condensate production.
New rules requiring Mozambique’s LNG industry to supply 25% of production to the domestic market could stabilize gas deliveries to South Africa’s Secunda industrial center as the Pande and Temane gas fields near depletion.
-
Though the projects that have already been sanctioned will ensure that spending in the FPS sector will remain high over the forecast period, the growth in FPS market is significantly less than expected due to the collapse in oil prices, and installations in 2018 will decline.
-
A deepwater field located offshore Sabah, east Malaysia, features a spar dry-tree unit (DTU) and multiple subsea-hub tiebacks to a floating production, storage, and offloading vessel (FPSO).
-
After 10 years, the world’s first cell spar, Anadarko’s Red Hawk, was decommissioned. It remained the only cell spar fabricated and again made history as the deepest floating production unit ever decommissioned in the GOM.
-
For Anadarko, the secret of the “design one, build many” approach to offshore production facilities is to control its enthusiasm for change. The company’s experience with eight operated spars shows the benefits gained with this approach.
-
Semisubmersible floating production systems (SFPSs) with steel catenary risers (SCRs) are attractive field-development solutions, especially in deeper water of Western Australia. However, SCR design is challenging in the offshore Western Australia environment because of severe cyclonic environments.
-
A new type of organically modified silica glass that can remove a wide variety of oils and contaminants from produced and flowback water is showing promising results as it undergoes field trials.
-
Although the commissioning of a floating production system (FPS) generally takes place between the “mechanical completion” and “first oil” stages, commissioning activities begin long before then.
-
LLOG Exploration’s Delta House floating production system (FPS) looms large over Kiewit Offshore Services’ fabrication yard in Ingleside, Texas.
-
After severe damage in a typhoon, the Huizhou oil field in the South China Sea was back on production in 5.5 months. This paper reviews how this feat was accomplished.
-
The SPE Gulf Coast Section’s Project, Facilities, and Construction study group is hosting a series of lectures, “What Have We Learned About Host Selection in Deepwater GOM After 20 Years of Being Off the Shelf?