A mature offshore Egyptian field has entered a depletion phase. Most of its gas lift design bases were initiated during production startup and feature standardized sets of large gas lift valve port sizes with narrow spacing. Inconsistent well flow during reservoir depletion adds complications to the system. Therefore, a screenout model was created to select candidate wells for downsizing and for changing out with dummy and Venturi valves.
×

Restricted Content
We're sorry, but this content is reserved for SPE Members. If you are a member, please sign in at the top of the page for access. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community.