Testing page for app
-
Over the years, hybrid systems have been installed in horizontal wellbores to increase the number of compartmental sections for hydraulic fracturing because of the limitations of ball-actuated fracture sleeves. Experimenting with hybrid systems provides operators with the ability to optimize spacing of fracture stages along the horizontal section when sleeve technolog…
-
The careful planning and successful execution of a multistage-fracture-stimulation completion in one of the first horizontal wells (KZN-F) drilled in the Amin formation in north central Oman instigated a step change in initial production rate and long-term deliverability from this tight-gas-sandstone reservoir. The operator and service company worked as a team, modeli…
-
Statoil, operating the Troll field in the Norwegian sector of the North Sea, wished to run a deep sidetrack from the main bore in a multilateral well that would exit through the liner in the reservoir. Several zonal-isolation methods had been evaluated, but on the basis of previous experience Statoil decided to use swellable-packer technology. Testing revealed that th…
-
Recently, a series of instrumented perforation experiments demonstrated that existing cleanup models do not accurately predict perforation cleanup when perforating in a DUB condition.
-
Recently, while preparing to present a seminar on deepwater-well-construction optimization, I tried hard to find a word or a phrase that could be seen as “the secret” for a safe and optimized drilling performance.
-
Data-mining processes are fundamental in obtaining the predictive benefits of real-time systems and have been progressing from descriptive to predictive optimization methods.
-
During the optimization process, the Castilla field became the model of management strategies for the rest of the fields in the company portfolio.
-
Integration of technology applications is paramount in increasing the success rate of data delivery.
-
This paper is investigates installed cost overruns of pipeline-compressor-station projects, using data from more than 200 projects. Results of the analysis show that project size, capacity, location, and year have different impacts on individual component overruns.
-
Valuation of the enhanced flexibility offered by platform-based development solutions and sequential subsea solution is difficult. This leads to the question: Are development solutions being selected without taking sufficient account of option values?