Testing page for app
-
A North Sea field development included installation of long 4½-in. completion liners in the horizontal reservoir sections of each well. To minimize overall risk, the operator planned to use managed-pressure drilling (MPD).
-
This paper presents full-scale tests that show it is possible to obtain good cement placement when the tubing is left in the hole.
-
A field well was designed, built, and used to demonstrate the concept of real-time monitoring of the flow of drilling mud and smart cement and the hardening of the cement in place.
-
Momentum is building for what is being called the “peak demand” theory—that before too long global oil demand will begin to fall.
-
This paper discusses an expandable-liner-hanger (ELH) system that provides liner rotation during the liner deployment and the cementing operation while providing a hydraulically energized liner-top seal upon setting.
-
When companies are rewarded for short-term performance, there is little incentive to deal with long-term risks such as decommissioning. It’s so much easier to leave it for the future; but increasingly, that future is now.
-
Despite cement’s remarkable properties, the search continues for enhancements in the areas of cost and isolation performance. Efficiencies and enhancements have been explored even to the point of replacing cement with other materials.
-
The conductor anchor node (CAN) technology was introduced as part of the architecture for Centrica’s Ivory deepwater exploration well in the Norwegian Sea to optimize efficient operations for the well’s riserless section.
-
Companies need effective talent acquisition and retention programs to succeed in the pending economic recovery.
-
In recent years, sustainability has emerged as perhaps the most critical imperative of this century.