Flow assurance

Fiberglass-Lined Tubing Helps Prevent Asphaltene Deposition in Oil Wells

This paper describes strategies for mitigating asphaltene deposition using fiberglass-lined production tubing and the successful trials thereof.

Asphaltene Deposition rate and extent

Asphaltene deposition in production tubing represents a major flow-assurance challenge. Common strategies to mitigate asphaltene deposition downhole include mechanical or solvent cleanouts and chemical inhibition. These are associated with production deferment, high job costs, safety and environmental risks, and operational issues. An operator has addressed this challenge using production tubing lined with glass-fiber-reinforced epoxy (GRE). This technology was implemented in two trial wells.

×
SPE_logo_CMYK_trans_sm.png
Continue Reading with SPE Membership
SPE Members: Please sign in at the top of the page for access to this member-exclusive content. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community to gain full access.