An intelligent completion design was installed in two wells in China’s L field deepwater project. Both wells have dual-zone stack-pack sand-control lower completions. To handle critical well-control concerns and enable production from each zone, an intermediate string was installed to isolate the reservoir in each zone temporarily. While the complete paper details both the completion string design and its field installation, this synopsis concentrates on the former aspect of the project.
×
Continue Reading with SPE Membership
SPE Members: Please sign in at the top of the page for access to this member-exclusive content. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community to gain full access.