Production

Petrobras Pushes First Oil at Mero Into 2022

Oil from the Santos Basin has been postponed due to delays with the production system.

Map of the Mero field in Brazil.
Map of the Mero field in Brazil.

Petrobras has postponed first oil from its Mero 1 field via the FPSO Guanabara in the Santos Basin offshore Brazil due to delays with the production system. Startup at Mero 1 was originally expected in the fourth quarter of this year and is now expected to begin flowing during the first quarter of 2022 due to COVID-19 pandemic-related delays with the buildout of the production system in China.

The FPSO will be installed in the Mero field, which belongs to the Libra Block, in the Santos Basin pre-salt area, with a processing capacity of 180,000 OPD.

The field is operated by Petrobras (40%) in partnership with Shell Brasil Petróleo (20%), Total E&P (20%), CNODC Brasil Petróleo e Gás (10%), CNOOC Petroleum Brasil (10%), and Pré-Sal Petróleo, which is the contract manager.