The complete paper presents an overview of the operator’s Marlim and Voador fields revitalization project, highlighting achievements so far in the context of Campos Basin redevelopment. The project includes two mature fields discovered in the 1980s in the eastern portion of the Campos Basin. The main purpose of the revitalization is to renew production systems by means of decommissioning nine existing platforms and installing two new floating production, storage, and offloading (FPSO) vessels.
Marlim and Voador Fields Overview
Fig. 1 above depicts shallow and deepwater hubs in the Campos Basin.
×
Continue Reading with SPE Membership
SPE Members: Please sign in at the top of the page for access to this member-exclusive content. If you are not a member and you find JPT content valuable, we encourage you to become a part of the SPE member community to gain full access.