Brazil
-
The paper details subsea system development for the Mero field and how operation of Mero’s early production system influenced the final configuration for all Mero projects.
-
In addition to securing the rig, Equinor has, on behalf of the partners, awarded SLB, Baker Hughes, and Halliburton agreements for drilling and well services for the Raia project worth around $109 million.
-
The set of new-generation FPSOs will be delivered in 2029 equipped with technologies that can cut greenhouse emissions by 30% given the unit’s all-electric configuration.
-
Contractor will design FPSO hull and related topsides facilities for the project located in the Santos Basin offshore Brazil
-
The post-salt, heavy-oil fields will be developed in tandem tied back to an FPSO.
-
This paper aims to analyze the relevance of wind and solar energy for the supply of artificial lift systems on offshore platforms in the Brazilian equatorial region.
-
Updates about global exploration and production activities and developments.
-
The Libra Consortium, led by Brazil’s Petrobras, has developed a method of separating carbon dioxide from reservoir fluids at the seafloor rather than the FPSO topsides.
-
The oilfield service giant said it has taken another big step toward fully autonomous drilling operations in its latest project offshore Brazil.
-
With the advancement of a legal framework for carbon capture and storage, Brazil is building CCS momentum. This article aims to shed light on what led to this momentum and what may come next.